Commissioning and Testing

Systems are not considered complete simply because they power on and display images.
Functions, performance targets, integration flows, error conditions, and user permissions are verified with predefined acceptance scenarios.
- Verification and System Acceptance
Testing, Commissioning, and Acceptance
Factory Acceptance and Pre-Integration Tests
When necessary, factory acceptance testing (FAT) and pre-integration testing are conducted to verify the suitability of system components before field deployment.
Site Acceptance and Performance Control
Within the scope of site acceptance testing (SAT), system functions, performance values, and application quality are checked.
Alarm and Interruption Scenarios
Alarms, cause-and-effect relationships, system interruptions, and redundancy scenarios are verified according to defined test steps.
Cybersecurity and Authorization Control
Cybersecurity configurations, user roles, access permissions, and authentication rules are checked.
Outstanding Tasks and Final Acceptance
Outstanding tasks are recorded; after corrections, retests, and verifications are completed, a signed acceptance record is created.